Project Manager/ R&D - Furniture (Có Xe Đưa Rước Từ HCM)
Công Ty TNHH Twin Star HOME Việt Nam
House no. 2, Lot L, XC1 Street, My Phuoc 2 Ward, Ben Cat Town, Binh Duong Province
Hết hạn
Xóa tin
Chi tiết tuyển dụng
Mức lương:
Thỏa thuận
Khu vực:
Bình Dương
Chức vụ:
Nhân viên
Hình thức làm việc:
Toàn thời gian
Lĩnh vực:
Khác
Mô tả công việc
1. Product Development (Sales Samples):
_ Pre sample Drawing Review
_ Sample Scheduling
_ Sample Approval
_ Sample Dispatch
2. Product Costing
_ Drawing Review
3. Ensure that quotation is submitted from the factory promptly.
4. Further, negotiate with the factory as necessary.
5. Production Control and On-Time Shipping:
_ Pre Production Sample and Review
_ Production Schedule:
5. Quality Control:
_ Review Critical Points of product PPS with QC staff prior to production. Refer to the “Product Summary Report” for a refresher. Perform First Production Run Audits & distribute support documentation to Director, DC, KM, M A & AB
_ Make periodic checks on the production line; make sure that standards are being maintained. Communicate any remarks for improvement and add to the “Product Summary Report”
_ Communicate daily with the QC staff for any issues or concerns with production. Inform the Production Manager immediately of any concerns. Log all issues and concerns in the “Product Summary Report”.
_ Conduct spot checks for QA testing of materials (carton burst, lead content, adhesion, corrosion, etc.). Make sure that testing results are included in the “Product Summary Report"
_ Confirm “Approved” standardized parts being used.
_ Sign off on PSI Inspection Report before product shipment can be released. All product failed points should be logged on the “Product Summary Report”.
_ Help the QC solve any dispute with the factory over quality issues.
_ Pre sample Drawing Review
_ Sample Scheduling
_ Sample Approval
_ Sample Dispatch
2. Product Costing
_ Drawing Review
3. Ensure that quotation is submitted from the factory promptly.
4. Further, negotiate with the factory as necessary.
5. Production Control and On-Time Shipping:
_ Pre Production Sample and Review
_ Production Schedule:
5. Quality Control:
_ Review Critical Points of product PPS with QC staff prior to production. Refer to the “Product Summary Report” for a refresher. Perform First Production Run Audits & distribute support documentation to Director, DC, KM, M A & AB
_ Make periodic checks on the production line; make sure that standards are being maintained. Communicate any remarks for improvement and add to the “Product Summary Report”
_ Communicate daily with the QC staff for any issues or concerns with production. Inform the Production Manager immediately of any concerns. Log all issues and concerns in the “Product Summary Report”.
_ Conduct spot checks for QA testing of materials (carton burst, lead content, adhesion, corrosion, etc.). Make sure that testing results are included in the “Product Summary Report"
_ Confirm “Approved” standardized parts being used.
_ Sign off on PSI Inspection Report before product shipment can be released. All product failed points should be logged on the “Product Summary Report”.
_ Help the QC solve any dispute with the factory over quality issues.
Quyền lợi được hưởng
The wage agreements in interview.
,#Able to work in an active and professional working environment.
,#Insurance and Paid-leaves as required by Labor Law
,#Able to work in an active and professional working environment.
,#Insurance and Paid-leaves as required by Labor Law
Yêu cầu kỹ năng
Furniture, English, Product sourcing, Project Management, Supply Chain
-
Cửa Hàng Trưởng- Crocs Go Mall Di An Công ty Trách Nhiệm Hữu Hạn Một Thành Viên Thương Mại Thời Trang Tổng Hợp 8 - 10 Triệu