Tuyển Dụng Kỹ Sư (Accept Fresher - Oversea Training Opportunity)

HYUNDAI Kefico Lô XN 01 - Khu công nghiệp Đại An - P Tứ Minh, TP Hải Dương, T Hải Dương Còn 3 tuần để ứng tuyển

Chi tiết tuyển dụng

Mức lương: Thỏa thuận
Khu vực: Hải Dương
Chức vụ: Nhân viên
Hình thức làm việc: Toàn thời gian
Lĩnh vực: Sản xuất

Mô tả công việc

* Manufacturing Engineer (Kỹ sư Quản lý Sản xuất)
• Human management: with Deputy Foreman, Foreman assigns to work on line help balance on line
• Training: Make construction for training plan & implement training. Training obey about Manufacturing team regulation to Foreman, Deputy Foreman, Operator
• Production & quality control: Work with control plan, work instruction & implement inspection.
• Review production plan & set up operation following plan.
• Management MES/ERP data input (production output, scrap rate, line running analysis, manpower, part other usage).
• Handle & control of scrap & rework part.
• Make report preventive/ corrective action.
• Control raw material to provide production. Control 6M change, traceability for material, semi-finished products and finished products
* Manufacturing Quality Engineer (Kỹ sư Quản lý Chất lượng Sản phẩm)
1. Establishing line's standard (Process inspection standard/ Outgoing inspection standard/ Limit sample,...)
2. Regular job: Reliability test, process audit, product audit, MSA
3. Leader of Process failure/ Quality Issue in daily line containment and corrective action,...) and control process quality improvement (Control annual quality target, make report, analysis quality problem,...
4. Internal 6M change:
- Review 6M change request (customer need or only internal approval)
- Verify/control of 6M change status (failure/ customer rate)
5. Coordinate to related departments to improve quality problem
* Part Development & Localization Engineer (Kỹ sư Phát triển và Nội địa hóa linh kiện)
1. Parts development & localization
• Sourcing new potential suppliers
• Organizing new supplier registration audit
• RFI, RFQ, SOR and KPIS process management (KEFICO PURCHASING INFORMATION SYSTEM)
• Development planning (Proto/ISIR sample, part evaluation, TR, Reliability test,
Part approval, SOP)
• Controlling schedule and part quality for new project
2. Serial part management
• Part 6M/ECO change management
• Material shortage handling
• Material block stock controlling
3. Supplier management
• Regular supplier audit (5-star, craftsmanship audit…)
• Outsourcing asset management
• Local supplier post evaluation on delivery and quality...
4. New project management: sample preparation for event (M parts – LO/CKD sources) , parts packing standard handling, sample part improvement, BOM list, ECO &
Part approval monitoring
5. Maintain QMS document (IATF16949 process and instructions)
6. Material cost innovation, cost saving & Price control
7. Other duties by leaders
* Manufacturing Maintenance Engineer (Kỹ sư Bảo dưỡng)
• Oversea to study new technology and take over new projects
• Machines and equipment maintenance
• Repair and change equipment of machines
• Propose and make maintenance plan, manage necessary spare parts to ensure minimize machine breakdown
• Continue improvement machine & equipment ability to increase productivity and achieve the best quality
• Cost down activities implement, quality up
• Other duties assigned by manager
* Product Development Engineer (Kỹ sư Phát triển sản phẩm)
1) Project management:
- Project schedule, organization chart establishes
- Consultative meeting body meeting leading:
+ OPL management: Check progress status of major issues (OPL list, PM meeting)
+ Manage project progress status and identify risks/issues related to master schedule and sample events
+ Check the status of gate inspection based on master schedule
2) Production product's specification management
a) Product's design management for mass production support: (Drawing, Test specification, BOM list):
- Download, storage, update and distribution to related Team
b) Product's design change order management (ECO): Product's specification making, verifies and submit for approval by PDM system
c) Product's design change request management (ECR)
- Review design change request from related Team through product quality issue consultant
- Cooperate with KGP Design Team to define try-out (WOW) and submit for design change request by PDM system
3) Development Product management
- Variant Design development: Cooperate with Korea Design Team for SOR/RFQ analysis, Design concept and new drawing distribution
- Proto sample management: Planning, material receive and management, sample making and submit inspection data to KGP Proto Team

Quyền lợi được hưởng

Làm việc từ thứ 2 - thứ 6, 12 ngày phép/ năm, 06 ngày nghỉ công ty (trả nguyên lương)
,#Đào tạo trong nước, nước ngoài :Đức, Singapore, Hàn Quốc, Nhật Bản, Ấn Độ...
,#Xe đưa đón từ Hà Nội-Nhà máy; Hải Dương-Nhà máy

Yêu cầu kỹ năng

English, Process Control, Maintenance, Quality Control, Tự Động Hóa